Placing wellbore plug material after AxterMill and Retrieve operations
AxterCement represents a method for how to (rig-lessly) cement a wellbore where the microtube(s) have been removed by penetrations (“windows”) in the tubing string.
Placing the barrier material in a wellbore is essential to permanently leave tubing in casing for wellbore abandonment. AxterCement enables “P&A on a wire”.
Technical
Outer Diameter | 3.425” (87 mm) |
Maximum Makeup Length | 700” (17 800 mm) |
Maximum Working Pressure | 5.000 PSI (345 bar) |
Maximum Temperature | 257°F (125°C) |
Tubing Size | 4-½” |
Cable | Mono-conductor |