Placing wellbore plug material after AxterMill and Retrieve operations

AxterCement represents a method for how to (rig-lessly) cement a wellbore where the microtube(s) have been removed by penetrations (“windows”) in the tubing string.

Placing the barrier material in a wellbore is essential to permanently leave tubing in casing for wellbore abandonment. AxterCement enables “P&A on a wire”.

Technical

Outer Diameter3.425” (87 mm)
Maximum Makeup Length700” (17 800 mm)
Maximum Working Pressure5.000 PSI (345 bar)
Maximum Temperature257°F (125°C)
Tubing Size4-½”
CableMono-conductor